MURASIE FUNCTION VENUE
FLOOR REFURBISHMENT
Product used:

PROJECT LOCATION
Korsika Farm, Struisbaai, Western Cape

SIZE OF PROJECT
350 m2

NATURE OF PROJECT
abe.®screed dura.®top were used for the refurbishment of the flooring in the main function hall. After mechanical vacuum grinding, the exposed concrete floor received a double coating of abe.®screed SLC acrylic primer, followed by an 8mm application of abe.®screed dura.®top. Finally, the floor was sealed with CHRYSO Finisol Brut. abe.®screed SLC acrylic primer helped to improve abe.®screed dura.®top’s adhesion to the concrete substrate, reduced surface absorbency, and sealed the substrate

OTHER PRODUCTS USED
abe.® screed SLC acrylic primer
CHRYSO Finisol Brut

CONTRACTOR DETAILS
Korsika Farms Staff

PROJECT START & END DATES
September 2018

a.b.e.® EMPLOYEE INVOLVED
Johnie Emmerich

COLOURS AVAILABLE:
White or grey.